Sage MAS 90 and 200 Sage MAS 500 blogs Product Feedback Support Training
Reply
Contributor
Bear505
Posts: 32
Registered: 11-21-2008
0

Another way to change Std. Cost in Version 4.40.0.5

We just made a tremendous upgrade from 4.05 to 4.4... (YIKES)

 

One of the problems that I'm seeing is that I no longer have the ability to change the Std Cost on the Inventory Maintenance screen, and in order to go through Std Cost Adjustment, EVERYONE has to be completely out of the system...

 

There's got to be a better way...

Contributor
Bear505
Posts: 32
Registered: 11-21-2008
0

Re: Another way to change Std. Cost in Version 4.40.0.5

Really? there's no other way to get this done?

 

What about automatically changing the Std Cost to read "Last Cost"?

Sage MAS Partner
bethbowers
Posts: 260
Registered: 11-16-2008
0

Re: Another way to change Std. Cost in Version 4.40.0.5

You can call it whatever you want, but to change the field MAS knows as Standard Cost will require using the new procedures.  You can, however, create a file with the item and the new standard cost and import it into the work files while everyone is on the system and then just run the register and update with folks off.  (Assumes you own Visual Integrator)

Beth Bowers, MAS90/200 Certified Consultant
Mommy to Sammy, ChiChi, Gretchen, Button, Rosie, Biggie, Pogo, Sofia, Angie, and Brandy