Sage MAS 90 and 200 Sage MAS 500 blogs Product Feedback Support Training
Reply
Sage MAS Partner
ridgeback
Posts: 53
Registered: 11-25-2008
0

MAS200 v4.30, VI Import job for BOM Production Entry

Hello, Forum - Another VI job that I am struggling with and hoping to get some insight on. 

 

Need to write a VI import job that will bring in BOM Production Entries, and the VI job must be able to accommodate situations where the top level item may be serialized AS WELL AS the components. 

 

I have tried doing this in reverse....ie, entering a BOM Production Entry that has several entries, some for serialized items, some that are not. Then writing an export job to push that data out to a csv file to see what it looks like.  Then, I dumped my test BOM Production Entry data and tried to write a VI import job to match the file I created before.   Again on the import side, I am doing something wrong...is there some sort of logic that I am not understanding on the import?

 

Appreciate any insight that anyone can give me.  Thank you!